Monday 30 May 2016

Amazing Facts

Be joyful in everything you do and in any positive ways to make it possible.

Sunday 29 May 2016

Duterte; Yesterday, Today and Tomorrow

I am one of the seafarers or OFW's who want peace of mind for the family safety at home. My family and I visited Davao city and stayed there for 3 days. For us Davao city is one of the best places to live in many aspects. We have seen a campaign poster, "Duterte: Yesterday, Today and Tomorrow"

Wednesday 9 December 2015

Did you know about Seafarers?

Did you know? Some Seafarers spent almost half of their lives at sea away from their family. Only seafarers can explain their different feelings and reasons. Did you ask them about their job? Did you ask them about their colleagues? Did you ask them if they are okey? But, of course the answer will be "I'm fine and don't worry". It is because they don't want that their love ones will be worried. Can you imagine working while in bad weather? Did you ask them if they can sleep well? Did you ask them if they can eat properly during rough seas? Did you know the hardships, risks, stress and pressure being handled onboard? Did you know how they can handle things on board while their family has a problem at home? Did you know their feelings in times when one member of the family has an illness? Did you know their feelings when the allotment will not be on time and financially in need? Did you say thank you to them?

Wednesday 2 December 2015

Goodbye Paper Chart - Welcome ECDIS

Farewell to you Paper Chart. Thank you for being part of our Profession. Welcome ECDIS to all ships.

Wednesday 24 June 2015

Day of Seafarers


A seafarer's hardships are always been carried on board.
A seafarer is away from home and family.
A seafarer has always been at risks due to hazards, weather, nature of job, difficult cargo operations and unforeseen circumstances.
A seafarer must have patience, knowledge, trust, faith, hope, courage, respect and love.
A seafarer on vacation is never been completely happy. The times are divided between trainings and family.
You shall never underestimate a seafarer. Every individual has a unique purpose in life.

Celebrate the Day of Seafarers.

Good luck to all seafarers.

Have a safe navigation and safe work on board.

Safety First!

Please share your stories or moments on board in comments below.

Wednesday 10 June 2015

GARBAGE MANAGEMENT PLAN

1. INTRODUCTION
2. PURPOSE
3. DEFINITIONS
4. TRAINING, EDUCATION AND INFORMATION
5. MINIMIZING THE AMOUNT OF POTENTIAL GARBAGE
6. SHIPBOARD GARBAGE HANDLING AND STORAGE PROCEDURES
    6.1 Sorting and Collecting
    6.2 Plastics
    6.3 Food Wastes
    6.4 Oil and gas filters
    6.5 Other garbage
    6.6 Processing
    6.7 Storage
    6.8 Disposal
7. AVAILABLE EQUIPMENT FOR PROCESSING GARBAGE
    7.1 Comminutes or grinders
    7.2 Compactors
    7.3 Incinerators
8. PORT RECEPTION FACILITIES
9. ENSURING COMPLIANCE WITH ANNEX V
10. GARBAGE MANAGEMENT DAILY LOG
11. SPECIAL AREAS
12. SUMMARY OF REGULATIONS - MARPOL 73/78. ANNEX V

Thursday 21 May 2015

Permit to work system

Permit to Work systems are widely used throughout the petroleum industry. The permit is essentially a document which describes the work to be done and the precautions to be taken in doing it, and which sets out all the necessary safety procedures and equipment.

For operations in hazardous and dangerous areas, permits should normally be used for tasks such as:

- Hot Work.
- Work with a spark potential.
- Work on electrical equipment.
- Diving operations.
- Heavy lifts.
- Enclosed space entry.
- Cold work
- Working aloft
- Working on pressurized vessel
- Working over side
- Other hazardous tasks
The permit should specify clearly the particular item of equipment or area involved, the extent of work permitted, the conditions to be met and the precautions to be taken and the time and duration of validity. The latter should not normally exceed a working day. At least two copies of the permit should be made, one for the issuer and one for the person at the work site.

The layout of the permit should include a check-list to provide both the issuer and the user with a methodical procedure to check that it is safe for work to begin and to stipulate all the necessary conditions. If any of the conditions cannot be met, the permit should not be issued until remedial measures have been taken.

It is advisable to have distinctive Permit to Work systems for different hazards. The number of permits required will vary with the complexity of the planned activity. Care must be taken not to issue a permit for subsequent work that negates the safety conditions of an earlier permit. For example, a permit should not be issued to break a flange adjacent to an area where a Hot Work permit is in force.

Before issuing a permit, the Terminal Representative must be satisfied that the conditions at the site, or of the equipment to be worked on, are safe for the work to be performed, taking due account of the presence of any ships that will be alongside while the work is being carried out.

While companies will develop their own procedures for managing all aspects of operations and tasks undertaken, many operators choose to incorporate a Permit to Work system into their SMS in order to manage hazardous tasks.
A Permit to Work system is a formal written system that is used to control certain types of work. It delivers a risk based approach to safety management and requires personnel to undertake and record risk assessments in the development of a safe system of work.

Guidance for establishing a Permit to Work system is contained in a number of publications issued by industry organizations and various international safety bodies.

Copies of all permits should be posted as may be necessary. Copies should also be retained by the person in charge of the operation. If any repairs are to be carried out concurrent with cargo handling operations, specific permission should be granted by the terminal operators. Whenever practicable, a drill should be held prior to commencing repair work. Subsequent drills should be arranged when the repairs are to be carried out over an extended period. A dedicated Safety Officer should be appointed by the Master to co-ordinate the permit and certification processes associated with the repair period.