TEST No1 - 30L/NM Alarm Verification
1. Inform the Bridge OOW and Master. Call ECR to Open Air and Water on Deck.
2. Open Fresh Water Supply Valve (1), Fresh Water Valve (2) to Residual Tank and Air Supply Valve (3) in the (Pump Room)
3. Run one Hydraulic Valve pump (In CCR)
4. Check ODME Printer Paper
5. Switch ( ON ) the ODME system
6. Press "INPUT"
7. Press "3" (For PPM Set Up)
8. Press "MAN" ( And then if asking for GPS position press "AUTO")
9. Input " 290 "
10. Press " INPUT "
11. Press " 4 " (For Manual Speed in Knots)
12. Press " MAN "
13. Input " 10 "
14. Press " INPUT "
15. Press " 5 " ( For Manual Flow Rate in m3)
16. Press " MAN "
17. Input " 1000 "
18. Press " INPUT "
19. Press " SAVE "
20. Switch to ( MONITOR) (On Top of ODME System) (And wait until the overboard valve will open and valve to slop will shut.
21. Press " INPUT "
22. Press " 3 "
23. Input " 310 "
24. Press " INPUT "
25. Press " SAVE " ( Alarm will sound)
26. Press (ALARM) reset button (Color Red) ( Overboard valve will shut and Slop valve will open.
27. End of test (Switch to "STANDBY") (On Top of ODME System) And Reset to Normal Parameters - Auto Mode
28. Press " INPUT "
29. Input " 3 "
30. Press " AUTO "
31. Press " INPUT "
32. Press " 4 "
33. Press " AUTO "
34. Press " INPUT "
35. Press " 5 "
36. Press " AUTO "
37. Press " INPUT "
38. Press " SAVE "
49. Switch ( OFF ) the ODME system (alarm will sound)
40. Press the (ALARM) button (Color Red). ( Alarm will disappear in few seconds )
41. Close Fresh Water Supply Valve (1), Fresh Water Valve (2) to Residual Tank and Air Supply Valve (3) in the pump room.
42. Inform ECR and Bridge OOW
This is only for reference and does not replace any procedures onboard. It is recommended to refer to your company procedures and equipment manual for your actual equipment onboard.
By: Elums
No comments:
Post a Comment